Products

China Steel Structure Factory Framed Commercial Office Building, Structural Steel Truss Prefab Construction with Drawing

Keywords :

China steel structures project / steel structures factory / commercial office steel structures


  • Hits : 22
  • Company : Hubei Yongchuang Intelligent Parking Equipment Co., LTD
  • Landline : +86 13926872452
Contact Us

Product Details

Contact Us

Five Advantages Of Products

  • steel structures manufacturer
  • The manufacturing and installation of steel structure is highly industrialized
  • The internal structure of steel is very dense, so it is easy to be tight without leakage when welding, even riveting or bolt connection is used.
  • Steel is easy to rust in humid environment, especially in corrosive medium environment, so it needs regular maintenance, which increases maintenance cost.
  • The steel structure factory production quality is reliable, the size is accurate, the installation is convenient, easy to cooperate with the related parts.

Product Details


Product Description

Specifications

H beam Steel Structure Warehouse Fabrication

1) Main Steel                             Q345, Q235, Q345B, Q235B etc.

2) Column & Beam                        Welded or Hot rolled H-section

3) Connection method of steel structure      welding connection or bolt connection

4) Wall & Roof              EPS, Rockwool, PU sandwich, corrugated steel sheet

5) Door                                 Rolled up door or Sliding door

6) Window                              Plastic steel or Aluminum alloy window

7) Surface                              Hot dip galvanized or painted

8) Crane                                5MT, 10MT, 15MT and more

 

Drawings & Quotation 

Our excellent design team will design the steel structure building for you. We can quote If you give the following information.

 

1. Location (where will be built? ) _____country, area

2. Size: Length*width*height _____mm*_____mm*_____mm

3. Live load on roof(KN/M2), live load on second floor(KN/M2) if have

3. Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s

4. Snow load (max. Snow height) _____kn/m2, _____mm

5. Anti-earthquake _____level

6. Brickwall needed or not If yes, 1.2m high or 1.5m high

7. Thermal insulation If yes, EPS, fiberglass wool, rockwool , PU sandwich panels, Corrugated steel sheet with fiber glass wool will be suggested; If not, the Corrugated steel sheet will be ok. The cost of the latter will be much lower than that of the former.

8. Door quantity & size _____units, _____(width)mm*_____(height)mm

9. Window quantity & size _____units, _____(width)mm*_____(height)mm

10. Crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m

11. Skylight belt, ventilator and any other accessories if needed.

 

Packaging & Shipping

Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

 

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

 

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

 

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

 

(5) The member to the construction site, timely organization of unloading, stacking area.

 

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

 

FAQ

1. You are manufacture factory or trading company?
We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism. Also you will can get best and most competitive price after visiting us.

2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings and video for free. We can send engineers as installation director or a team upon request.

4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using Auto CAD, PKPM, MTS, 3D3S, and etc. we can design complex industrial building like office mansion, super marker, auto dealer shop, shipping mall, 5 star hotel.

6. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 30 days after receiving deposit.

7. How can you get a quotation for your projects?
You can contact us by email, phone, , Whats App, Skype and so on 24*7 and you will get reply within 8 hours.

 


Hubei Yongchuang Intelligent Parking Equipment Co., LTD

Contact Person: Ms Melody Ruan

Telephone: +86 13926872452

Landline: +86 13926872452

Company Address: Dongcheng Development Zone, Shiyan City, Hubei Province

Factory Address: Pengrun Building, Hengkeng Songxi Road, Liaobu Town, Dongguan City, Guangdong Province

Website: dongrigroup.us764.com

Previous: Export to Europe Prefab Steel Str...

Next: No

Inquiry :

Inquiry