Products

Steel Structure Framed Commercial Office Building, Structural Steel Truss Prefab Construction with Drawing

Keywords :

Commercial Office Building steel structures / steel structures project / hall steel structure manufacturer


  • Hits : 64
  • Company : Hubei Yongchuang Intelligent Parking Equipment Co., LTD
  • Landline : +86 13926872452
Contact Us

Product Details

Contact Us

Five Advantages Of Products

  • Steel is easy to rust in humid environment, especially in corrosive medium environment, so it needs regular maintenance, which increases maintenance cost.
  • The production of steel structure components in the factory can reduce the workload on site, shorten the construction period, meet the requirements of industrialization, not only save resources, but also reduce some unnecessary pollution.
  • The steel structure factory production quality is reliable, the size is accurate, the installation is convenient, easy to cooperate with the related parts.
  • It is light in weight and high in strength. The weight of the house built with steel structure is about 1 / 2 of that of the reinforced concrete residence. It can meet the needs of large space of residence, and the usable area is about 4% higher than that of reinforced concrete residence.
  • The steel can be recycled, and it has less environmental pollution during construction and demolition. These advantages are the value of steel structure house. He used these advantages to hold up the

Product Details

Product Description

Specifications

H beam Steel Structure Warehouse Fabrication

1) Main Steel                             Q345, Q235, Q345B, Q235B etc.

2) Column & Beam                        Welded or Hot rolled H-section

3) Connection method of steel structure      welding connection or bolt connection

4) Wall & Roof              EPS, Rockwool, PU sandwich, corrugated steel sheet

5) Door                                 Rolled up door or Sliding door

6) Window                              Plastic steel or Aluminum alloy window

7) Surface                              Hot dip galvanized or painted

8) Crane                                5MT, 10MT, 15MT and more

 

Drawings & Quotation 

Our excellent design team will design the steel structure building for you. We can quote If you give the following information.

 

1. Location (where will be built? ) _____country, area

2. Size: Length*width*height _____mm*_____mm*_____mm

3. Live load on roof(KN/M2), live load on second floor(KN/M2) if have

3. Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s

4. Snow load (max. Snow height) _____kn/m2, _____mm

5. Anti-earthquake _____level

6. Brickwall needed or not If yes, 1.2m high or 1.5m high

7. Thermal insulation If yes, EPS, fiberglass wool, rockwool , PU sandwich panels, Corrugated steel sheet with fiber glass wool will be suggested; If not, the Corrugated steel sheet will be ok. The cost of the latter will be much lower than that of the former.

8. Door quantity & size _____units, _____(width)mm*_____(height)mm

9. Window quantity & size _____units, _____(width)mm*_____(height)mm

10. Crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m

11. Skylight belt, ventilator and any other accessories if needed.

 

Packaging & Shipping

Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

 

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

 

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

 

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

 

(5) The member to the construction site, timely organization of unloading, stacking area.

 

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

 


Hubei Yongchuang Intelligent Parking Equipment Co., LTD

Contact Person: Ms Melody Ruan

Telephone: +86 13926872452

Landline: +86 13926872452

Company Address: Dongcheng Development Zone, Shiyan City, Hubei Province

Factory Address: Pengrun Building, Hengkeng Songxi Road, Liaobu Town, Dongguan City, Guangdong Province

Website: dongrigroup.us764.com

Previous: Wholesale Customized Industrial S...

Next: Export to Europe Prefab Steel Str...

Inquiry :

Inquiry