Products

Wholesale Customized Industrial Steel Structure Series Building Workshop Warehouse

Keywords :

steel building steel structure / steel workshop structure / hotel building steel structure


  • Hits : 55
  • Company : Hubei Yongchuang Intelligent Parking Equipment Co., LTD
  • Landline : +86 13926872452
Contact Us

Product Details

Contact Us

Five Advantages Of Products

  • High strength, light weight
  • Good plasticity and toughness
  • reliability
  • Weldability
  • High sealing performance

Product Details


Wholesale Customized Industrial Steel Structure Series Building Workshop Warehouse 

 

Our excellent design team will design the steel structure building for you. We can quote If you give the following information.

 

1. Location (where will be built? ) _____country, area

2. Size: Length*width*height _____mm*_____mm*_____mm

3. Live load on roof(KN/M2), live load on second floor(KN/M2) if have

3. Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s

4. Snow load (max. Snow height) _____kn/m2, _____mm

5. Anti-earthquake _____level

6. Brickwall needed or not If yes, 1.2m high or 1.5m high

7. Thermal insulation If yes, EPS, fiberglass wool, rockwool , PU sandwich panels, Corrugated steel sheet with fiber glass wool will be suggested; If not, the Corrugated steel sheet will be ok. The cost of the latter will be much lower than that of the former.

8. Door quantity & size _____units, _____(width)mm*_____(height)mm

9. Window quantity & size _____units, _____(width)mm*_____(height)mm

10. Crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m

11. Skylight belt, ventilator and any other accessories if needed.

 

Packaging & Shipping

Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

 

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

 

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

 

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

 

(5) The member to the construction site, timely organization of unloading, stacking area.

 

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

 

Hubei Yongchuang Intelligent Parking Equipment Co., LTD

Contact Person: Ms Melody Ruan

Telephone: +86 13926872452

Landline: +86 13926872452

Company Address: Dongcheng Development Zone, Shiyan City, Hubei Province

Factory Address: Pengrun Building, Hengkeng Songxi Road, Liaobu Town, Dongguan City, Guangdong Province

Website: dongrigroup.us764.com

Previous: Hot sale vehicle parking lifting ...

Next: Steel Structure Framed Commercial...

Inquiry :

Inquiry